cable length
英 [ˈkeɪbl leŋθ]
美 [ˈkeɪbl leŋθ]
链(英国608英尺,美国720英尺);电缆长度;线长;电线长度
英英释义
noun
- a nautical unit of depth
双语例句
- The basic theory of control method of unstressed cable length is illustrated. And this control method is employed for adjustment hanger force of self-anchored suspension bridge, order to conform with require of design.
阐述了无应力索长控制法的基本理论,并采用该控制方法调整自锚式悬索桥吊杆的内力值,使之符合设计要求。 - First, the initial status and the initial cable length were calculated by means of controlling the cable force and the internal force of all members in the pre-stressed state were obtained at the same time.
首先通过控制索在预应力态下的张拉力求得零状态和索原长,并同时获得预应力态下所有单元的内力。 - Based on the parabola and catenary theories, calculation formulas on the cable length are summarized, and the precision is discussed.
以抛物线和悬链线理论为基础,总结推导了悬索索长的实用计算公式,对各公式的计算精度进行了分析。 - In this paper, to avoid the current-contact measurement of the drawbacks, a laser Doppler Effect based on the non-contact cable length measurement is used.
本文针对现行接触式测量所存在的弊端,采用了一种基于激光多普勒效应的非接触式电缆长度测量方法。 - It is found that the efficiency of optimal adjustment method with the variation of cable length as design variables is high. It has based a way for the shape adjustment of whole cable net antenna structure. 3.
通过大量的数值计算,得出了基于索长改变量为设计变量的优化调整方法效率高的结论,为天线整体结构的网面调整奠定了基础。 - Meanwhile, a decision method for determine an unknown cable length also recommend.
同时本文还向大家介绍一下未知电缆长度的电缆长度的简易判定方法。 - Place the units in their intended mounting locations to check the cable length and monitor installation conditions.
把设备放入计划好的安装位置,检查电缆长度和监视器安装条件。 - Under the conditions of given initial mid-span deflection, the cable length increment and load increment were obtained by means of the mid-span deflection increment.
在给定初始跨中挠度的条件下,利用跨中挠度增量值求得索长增量值与载荷增量值; - However, the issue of measuring precision in the wire and cable market becomes more and more prominent. It is significant to measure the cable length precisely, rapidly and economically.
然而,目前电线电缆市场上存在的计量问题日臻突出,如何准确、迅速、经济的实现对电缆长度的测量,具有重要的理论意义和研究价值。 - Starting from the pre-stressed state, the tension force was calculated by controlling the initial cable length.
从预应力状态开始,通过控制索原长来追踪索在施工中的张拉力。
